Guidance

CDM 2015, explained properly

31 pages answering the questions people actually search for, written from the regulations and HSE guidance rather than from other consultants' websites. Every page names its sources and carries the date it was last reviewed.

Start here

There are also free tools. A principal designer checker, an F10 threshold checker, a dutyholder map, a pre-construction information checklist and a construction phase plan readiness checker. All of them give you a usable answer whether or not you ever buy anything. Open the tools.

Principal designer

What the role is, when it has to be appointed, and what it costs.

What is a CDM principal designer?The CDM 2015 principal designer role explained: what the appointment covers, who can hold it, and when it is required.When is a CDM principal designer required?The single test that decides whether a CDM principal designer must be appointed, what counts as a contractor, and when the appointment has to be in place.What does more than one contractor mean under CDM 2015?The phrase that decides whether a principal designer is required. What counts as a contractor, and whether they have to be on site together.Do subcontractors count as contractors under CDM?Yes, and it usually changes the answer on a domestic project. Why subcontracted trades count towards the more than one contractor test under CDM 2015.Does a house extension need a CDM principal designer?Usually yes. Why almost every extension crosses the more than one contractor test under CDM 2015, what the appointment involves, and what it costs.Does a loft conversion need a CDM principal designer?Almost always yes. Loft conversions carry two risks worth coordinating before work starts: the existing roof, and the structure being cut into.Does CDM apply to domestic projects?Yes. What changes for a domestic client is who carries the duties, not whether the regulations apply. Regulation 7 explained, including the DIY line.What are the CDM principal designer's duties?Regulation 11 and regulation 12, set out in plain English, with what each duty looks like in practice on a small project.When should the principal designer be appointed?As soon as is practicable and before the construction phase begins. Why design stage is the point of the role, and what to do if you are late.How much does a CDM principal designer cost?What the market charges, how fees are usually structured, what moves the price, and ClearCDM's published figures.

For designers

For architects, architectural designers and engineers: what lands on you, what does not, and how to place the role somewhere else.

Which role is which

Two principal designers, one project, and the roles CDM 2015 replaced.

Pre-construction information

The document the whole thing turns on: what it is, what goes in it, and who provides what.

For contractors

Construction phase plans, principal contractor duties, and what you should be given before you start.

The documents

Health and safety files and F10 notifications, with the thresholds and the arithmetic.

Still not sure whether it applies to you?

Six questions, a plain answer, and the reasoning shown. Nothing to buy.

Open the checker →

Not sure yet? get a fixed fee.