CDM principal designer in Marylebone
The statutory CDM 2015 principal designer appointment, taken as a standalone service on Marylebone projects. Fixed fees, priced online, with the whole appointment handled through short structured forms and one site visit.
Short answer
If your project in Marylebone will involve more than one contractor, including subcontracted trades that never overlap, regulation 5 of CDM 2015 requires you to appoint a CDM principal designer in writing before construction begins. ClearCDM takes that appointment on residential and smaller commercial projects, on a fixed fee from £750 plus VAT. If nobody is appointed on a domestic project, regulation 7(2) puts the role on the designer in control of the pre-construction phase, whether or not anyone has discussed it.
Projects we take on in Marylebone
- Refurbishment and structural alteration of period houses
- Rear and side return extensions
- Loft conversions
- Flat and apartment refurbishment in converted or purpose built buildings
- Basement and lower ground floor works
- Small commercial and retail fit out
What tends to matter on Marylebone projects
Marylebone is Westminster, and Westminster publishes conservation area audits and guidance for the areas it covers. The stock is dense and mixed: Georgian and later terraces on the estate grid, mansion blocks, and a substantial layer of upper floor residential over commercial ground floors.
- Mixed use above and below. A residential refurbishment above a working shop or restaurant is a different project from the same work in a house. Escape, structure, services and hours are all shared with somebody whose business does not stop.
- Deep plan terraces with vaults. Basements, light wells and vaulted areas under the pavement, frequently carrying services and frequently in unrecorded condition.
- No site to speak of. Storage, welfare, deliveries and waste all have to be solved on a street with controlled parking and restricted hours. That is a pre-construction logistics problem, and it belongs in the information a contractor prices on.
- Party wall density. Attached on both sides, above and below. The number of adjoining owners on a Marylebone project is often the largest single administrative and coordination factor.
What we checked for this page is listed under sources at the foot. Where a statement could not be checked against the council or Historic England it is not on the page, and none of this says every project in Marylebone involves all of it.
How the appointment runs
Five steps, short forms, one site visit. The appointment in writing, structured forms to everybody involved, a visit to record the building as it is, the design risks coordinated, and the pre-construction information issued to whoever is pricing and building before work starts. The full process, and what the role covers.
Fees
Fixed fees from £750 plus VAT, read off a published schedule rather than taken as a percentage of your build. The same starting fees apply wherever the project is, and the figure on your confirmed quote is the figure you are invoiced: there is no expenses line and nothing is added afterwards. The fee schedule.
This is the CDM role, not the Building Regulations one
Since October 2023 England has had a second principal designer role, under Part 2A of the Building Regulations 2010. It is a separate appointment about designing to meet the Building Regulations, and ClearCDM does not provide it. Most projects that need one need both. The difference in full.
Pre-construction information for a Marylebone building
The pack for a project here tends to be short and specific. What earns its place is the handful of things nobody could work out from the drawings: the asbestos position for a building of this age, what is actually loadbearing and in what order it can come out, where the services run, who is on the other side of each wall, whether anyone is living in the building while it is opened up, and how the scaffold and the skip reach the work.
How we build the pack, or generate a checklist for your own project.
Questions we get asked in Marylebone
Are your fees different for a Marylebone project?
No. The published starting fees are the same wherever the project is, and the figure on your confirmed quote is the figure you are invoiced. We work from Bristol and do not have a London office, which we would rather say than pretend otherwise.
Who appoints the principal designer on a Marylebone flat refurbishment?
The client, in writing, wherever more than one contractor is involved. If the flat is your own home you are a domestic client and regulation 7 moves most of your other duties to the principal contractor. If you are a landlord, the work is connected with a business and the full client duties in regulation 4 stay with you.
Nearby
Sources